We will be testing automatic mode switching on AO-51 for 2 days each week on Wed & Thur this month, except for Dayton week.  The rest of the time AO-51 will be in 'normal' mode.
I will do the first mode switch on an early US east coast pass between 1300-1500Z,  2 May 2007.  The AO-51 schedule for May on the AMSAT web site has been updated.   http://www.amsat.org/amsat-new/echo/ControlTeam.php
Enjoy these modes and send comments and requests to the AO-51 Operations Group   ao51-modes at amsat.org 
73,
Gould, WA4SXM
AO-51 Operations Group and Command station
May 2007 AO-51 (AMSAT Echo) Schedule 
May 1 until May 31, subject to modification
Normal mode except for 2 days testing on Wed - Fri.  Testing of the automatic scheduler  
2 - 4 May 2007,  9 - 11 May &  23 -25 May,  no change during Dayton week, to be defined mode change the last week of the month
2 May - 4 May  Mode 7 Testing
  FM Repeater, V/U 
  Uplink: 145.920 MHz FM, NO PL Tone 
  Downlink: 435.300 MHz FM 
  QRP FM Repeater, V/U 
  Uplink: 145.880 MHz FM, NO PL Tone 
  Downlink: 435.150 MHz FM 
9 May - 11 May Mode 4 Testing  (Field Day configuration) 
  FM Repeater, V/U 
  Uplink: 145.920 MHz FM, NO PL Tone 
  Downlink: 435.300 MHz FM 
  FM Repeater, L/U 
  Uplink: 1268.700 MHz FM, NO PL Tone 
  Downlink: 435.150 MHz FM 
23 May - 25 May Mode 2 Testing
  FM Repeater, V/S 
  Uplink: 145.880 MHz FM, NO PL Tone 
  Downlink: 2401.2 MHz FM 
  Normal Mode 
FM Repeater, V/U 
Uplink: 145.920 MHz FM, NO PL Tone 
Downlink: 435.300 MHz FM 
9k6 Digital, V/U, Telemetry Only
Downlink: 435.150 Mhz FM, 9k6 Telemetry
    
    