Ladies & Gentlemen,
Here's the main thing to think about ITAR. ITAR regulates OUTFLOW of
information, it doesn't care about INFLOW of information. If you build
or design it by a non-US Person (Citizen or Legal Permanent Resident)
and you bring it INTO the US, ITAR does not care. So AMSAT-NA can use
designs from P3E, but cannot design parts of P3E.
So the logical thing to do is have all "major" future AMSAT spacecraft
be AMSAT-NA managed spacecraft with design elements (camera systems,
experiments, etc.) contributed by other AMSAT organizations. The only
main technical interaction between the AMSATs would be via a standard,
open-sourced, well-published-in-technical-journals interface
specification. Money could be contributed from other AMSATs to fund
launch & development costs.
As for the mantra of "no one being able to develop the equipment in the
US" . . . The volunteer base is not capped, just expand the size of the
volunteer base and organize it better. None of the experienced engineers
should be directly building hardware, we should all be supervising teams
of engineering students who actually build the equipment. There are over
250 University Engineering programs in the US. Each of those programs
have at least 50 students in each graduating class. Let's say that we
can get 15% of the students interested in working on a satellite
project (my personal observations are more like 75% of the students
are interested).
Let's do the Math:
Worse Case: 250 Schools x 50 students per graduating class x 15% = 1875
POTENTIALLY INTERESTED STUDENTS IN THE US
Best Case: 250 Schools x 50 students per graduating class x 75% = 9375
POTENTIALLY INTERESTED STUDENTS IN THE US
And this is just talking about COLLEGE SENIORS - EE's, ME's, CE's, CS's,
SE's . . . double the number if you include the Juniors.
Anywhere near this load of students would completely overload the
current AMSAT-NA volunteer base. But talk about the potentially
available volunteer base!
With Binghamton University, I had 7 Hardware Engineering slots available
on the team. There are 200 Hardware Engineers in the BU graduating class
- about 168 of the students wanted to be on the Satellite Project Team,
a 24x over-subscription. That's pretty impressive. I could have had more
teams, but we need to crawl, the walk, then run with this activity -
EVOLUTIONARY not REVOLUTIONARY (but let's just make sure evolution works
quickly . . .)
The current BU student team is "stoked", they are really excited to be
working the project. Every week I get thanked by the students for
bringing the project to their attention. They have done some really
great work and they have a great faculty advisor, Dr. Roger Westgate. I
expect that there will be more than 1 project team next year working on
an AMSAT satellite, assuming AMSAT is interested in sponsoring more.
So stop crying into your beer over ITAR. The world is not coming to an
end. Let's work to launch spacecraft within the ITAR limits.
In the meantime, let the AMSAT-NA BoD navigate it's way through the
byzantine structure of the US Govt to try to bring about change in ITAR.