Hi FO-29 Guys
This is FO-29 status from JARL command team.
This was written in Japanese and I translated to English.
-----------------------------------------------------------
FO-29 status in 2009
FO-29 launched in August 1996 and has been working 14 years.
FO-29 is planning to operate the consecutive use with the analog
transponder until the end of August 2009, but it was confirmed that a
transponder stopped on August 25.
In the later pass, the transponder operation is confirmed when we sent a
command of transponder ON from the control station, but we stopped
transponder temporarily now.
We had the a similar symptom of stopping the transponder in the spring
of 2007 .
FO-29 is in the "high shade rate period" now.
Both of the transponder stop in the spring of 2007 and this time are
thought that by this "high shade rate" and by the rise of the internal
resistance of the deterioration of the battery and by the influence of
the temperature of the battery.
The power control system FO-29 (PCU) watches a terminal voltage of the
battery and turns off the power supply of the transmitter automatically
if it becomes less than the setting voltage. In addition, When FO-29
enters the sunshine area and it recovers to the setting voltage by sun
battery power, it is designed to turn on a transmitter automatically.
However malfunction occurred for this function in 2007.
Because of transmitter was not turned on automatically, We made an
operation schedule plan from the summer of 2007 and managed 1-2 times on
in a day.
This management operation worked well. The electricity income and
expenditure restored or it was cured spontaneously.The transponder has
been worked without control command from control station from summer of
2008.
The power supply circumstances of current FO-29 is almost same situation
as stop period spring of 2007, scheduled operation period, the
consecutively operative period from the summer of 2008 and it is in a
"high shade rate". This transponder off is supposed to be a similar
situation as when transponder stopped in the spring of 2007.
From this , We decided that we make the operation schedule plan, and
manage the limit of the operative number of times in one day like last
time to keep the electricity income and expenditure untill improve the
"shade rate" which is in January, 2010.
-----------------------------------------------------------------------
Thanks control team
JA1COU Yutaka Murata
More information about the AMSAT-BB
mailing list