[amsat-bb] Re: G5500 disassembly

Nick Pugh K5QXJ quadpugh at bellsouth.net
Tue Jan 19 03:06:35 PST 2010


You can put the cap at the control box but if you want to take the rotator
apart.

1. Turn it upside down and unscrew the 4 screws that hold the ball bearing
racier.

2. Turn it right side up set it on the desk holding the bearing ring in
place

3. With the unit on the desk slide the bearing ring down and lift the
rotator out of the bearing racier. Be careful not to lift the top of the
rotator off the body of the rotator

4. Turn the rotator upside down and set it on the desk.

5. Lift the body of the rotator off the top of the rotator.

If you get the sequence wrong the ball bearings' will fall out no big deal
just capture the all the bearings and put them back in the racier.

Call if I have confused you  

Nick k5qcj cell 337 258 2527


-----Original Message-----
From: amsat-bb-bounces at amsat.org [mailto:amsat-bb-bounces at amsat.org] On
Behalf Of Paul Baldock
Sent: Monday, January 18, 2010 7:37 PM
To: amsat-bb at amsat.org
Subject: [amsat-bb] G5500 disassembly

I'm about to disassemble a Yaesu G5550 Azimuth Rotor to replace the 
Starting Capacitor. Has anybody done this and can give any 
suggestions? I'm concerned about taking it apart and a million pieces 
falling out

Thanks

- Paul

_______________________________________________
Sent via AMSAT-BB at amsat.org. Opinions expressed are those of the author.
Not an AMSAT-NA member? Join now to support the amateur satellite program!
Subscription settings: http://amsat.org/mailman/listinfo/amsat-bb



More information about the AMSAT-BB mailing list