[sarex] Re: Space-walkers Wrap Up Third Spacewalk
Ransom, Kenneth G. (JSC-OC)[BAR]
kenneth.g.ransom at nasa.gov
Fri Sep 15 10:45:28 PDT 2006
That "materials exposure experiment" mentioned in the second paragraph
also contained PCSAT-2. Thanks for the fun Bob!
Kenneth - N5VHO
-----Original Message-----
From: sarex-bounces at AMSAT.Org [mailto:sarex-bounces at AMSAT.Org] On Behalf
Of Arthur Rowe
Sent: Friday, September 15, 2006 12:02 PM
To: SAREX at AMSAT.Org
Subject: [sarex] Space-walkers Wrap Up Third Spacewalk
SUBMITTED BY ARTHUR N1ORC - AMSAT A/C #31468
*Spacewalkers Wrap Up Third Spacewalk*
Astronauts Joe Tanner and Heidemarie Stefanyshyn-Piper completed
STS-115's triple play by successfully conducting the mission's third
spacewalk at the International Space Station. During the 6-hour,
42-minute excursion, Tanner and Piper continued efforts to prepare the
station's newly installed P3/P4 truss segment for operation and also
completed other tasks devoted to the assembly and maintenance of the
station. The spacewalk came to a close at 12:42 p.m. EDT.
Shortly after beginning the spacewalk at 6 a.m. EDT, Tanner and Piper
retrieved a materials exposure experiment from the station's exterior
and performed maintenance on the P6 truss. The space-walkers then moved
to the P3/P4 truss, where they prepared a radiator for deployment.
Flight controllers unfurled the radiator, a device that will remove heat
from the station, at 9:11.
Tanner and Piper also installed a wireless TV antenna on the station and
replaced a faulty antenna assembly on the S1 truss. Near the end of the
spacewalk, Tanner and Piper conducted a test to evaluate infrared video
of Space Shuttle Atlantis' wing leading edge. They also performed
get-ahead tasks that were slated to take place on future spacewalks.
Mission Specialist Dan Burbank coordinated spacewalk activities, and
Mission Specialist Steve MacLean oversaw station robotic arm operations.
During this mission, MacLean became the first Canadian astronaut to
operate the arm built by his home country.
Later today, the station's mobile transporter will be moved to a
worksite on the P3 as part of checkout. The transporter is used move the
station's Integrated Truss Structure.
**
----
Sent via sarex at amsat.org. Opinions expressed are those of the author.
Not an AMSAT member? Join now to support the amateur satellite program!
Subscription settings: http://amsat.org/mailman/listinfo/sarex
More information about the SAREX
mailing list