[sarex] LAUNCH COVERAGE ,NASA's Launch Blog - Mission STS-116
Arthur Rowe
azrowe80 at verizon.net
Thu Dec 7 17:43:12 PST 2006
SUBMITTED BY ARTHUR N1ORC - AMSAT A/C #31468
LAUNCH COVERAGE
NASA's Launch Blog - Mission STS-116
TIMES ARE EASTERN STANDARD TIME
NASA's launch blog was activated on December 7, 2006 at 3:25 p.m. EST
*+ View All Launch Day Videos
<http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts116/launch/launch-allvideos.html>*
8:36 p.m. - With Discovery's crew safely strapped in and the vehicle
poised for flight, the Closeout Crew is leaving the launch pad.
Meanwhile, Discovery's onboard computer systems are being configured for
the proper guidance parameters for tonight's launch time.
8:34 p.m. - The Closeout Crew has been given permission to leave the
White Room, so they'll take the elevator down to the pad surface, then
lock it into place at the ground level before making their way off the pad.
8:29 p.m. - The countdown has resumed. T-20 minutes and counting. The
clock will hold once more at T-9 minutes. From now until the T-31 second
mark, any of the launch supporters or operators can ask for a hold in
the count.
8:27 p.m. - Weather has gone "green" in all areas -- meaning weather is
favorable for a launch tonight. Clouds appear to be high enough and
thinning out enough that they won't violate the ceiling rule.
8:24 p.m. - NASA Test Director Jeff Spaulding
<http://www.nasa.gov/centers/kennedy/about/biographies/spaulding.html>
is conducting his T-20 briefing, advising the team of any instructions
they need to know for the remainder of the countdown.
8:19 p.m. - T-20 minutes and holding. This is a 10-minute built-in hold.
The principal payload managers have been polled, and all are ready to
support launch tonight. The landing director will check on the landing
site and the SRB recovery ships will be checked to make sure they are on
site and ready to support launch as well.
8:17 p.m. - Commander Mike Polansky is pressurizing the gaseous nitrogen
system for the Orbital Maneuvering System engines, while Pilot Bill
Oefelein is activating the gaseous nitrogen supply for the Auxilliary
Power Units.
8:06 p.m. - Our launch time for this evening has been recalculated, and
the preferred launch time for this evening is 9:35:48 p.m. This time
will be fine-tuned once again during the T-9 minute hold.
The weather at the transatlantic abort sites
<http://www.nasa.gov/mission_pages/shuttle/behindscenes/tal_sites.html>
is still being evaluated. At least one site must be available in order
to launch.
8:03 p.m. - At T-26 minutes, 32 seconds and counting, the Eastern Range
has completed its closed loop test, which is the path of the destruct
signal that could be required in the event of an emergency. All systems
look good tonight, with no problems being reported
7:48 p.m. - At T-51 minutes and counting, the orbiter's hatch has been
closed and latched for flight.
7:36 p.m. - Once Discovery's hatch is closed, the crew will begin checks
to make sure the hatch is closed tightly.
After some discussion, the engineering team determined that the small
piece of ice or frost discovered at the top of the external tank is not
a danger.
"The configuration of that little, teeny piece of ice is not going to
prohibit our launch tonight," said NASA Commentator Bruce Buckingham
<http://www.nasa.gov/centers/kennedy/about/biographies/buckingh.html>.
7:30 p.m. - Shuttle Weather Officer Kathy Winters just briefed Launch
Director Mike Leinbach
<http://www.nasa.gov/centers/kennedy/about/biographies/leinbach.html> on
the weather situation. The ceiling is in the "red" for launch, but
that's the only weather violation at the moment.
*Did You Know?*
On Flight Day 12, two microsatellites will be launched from Discovery's
cargo bay. They'll measure the density and composition of the atmosphere
in low Earth orbit.
More information about the SAREX
mailing list