[sarex] NASA Starts Space Shuttle Endeavour Countdown Aug.
Arthur Rowe
azrowe80 at verizon.net
Mon Jul 30 10:23:07 PDT 2007
SUBMITTED BY ARTHUR N1ORC - AMSAT A/C #31468
John Yembrick
Headquarters, Washington
202-358-0602
j
George Diller
Kennedy Space Center, Fla.
321-867-2468
07.30.07
NASA Starts Space Shuttle Endeavour Countdown Aug. 4
CAPE CANAVERAL, Fla. - NASA will start the launch countdown for space
shuttle Endeavour's STS-118 mission at 9 p.m. EDT Saturday, Aug. 4, at
the T-43 hour point. The countdown includes 27 hours, 3 minutes of
built-in hold time leading to a preferred launch time at approximately
7:02 p.m. EDT Tuesday, Aug. 7. The launch window extends an additional
five minutes.
During the 11-day mission to the International Space Station,
Endeavour's crew will add another truss segment to the expanding
station, install a new gyroscope and add a spare parts platform. The
flight will have at least three spacewalks. It also will debut a new
system that enables docked shuttles to draw electrical power from the
station to extend visits to the outpost.
A detailed list of launch countdown milestones and times is available at:
http://www.nasa.gov/mission_pages/shuttle/news/index.html
This mission is the 119th space shuttle flight, the 20th flight for
Endeavour and the 22nd U.S. flight to the International Space Station.
The mission will be Endeavour's first flight in more than four years.
The shuttle has undergone extensive modifications, including the
addition of safety upgrades already added to shuttles Discovery and
Atlantis.
For more information about the STS-118 crew and mission to the space
station, visit:
http://www.nasa.gov/shuttle
<http://www.nasa.gov/mission_pages/shuttle/main/index.html>
More information about the SAREX
mailing list