[sarex] STS-120 Crew Completes Heat Shield Inspection
Arthur Rowe
azrowe80 at verizon.net
Wed Oct 24 10:05:53 PDT 2007
SUBMITTED BY ARTHUR N1ORC - AMSAT A/C #31468
*Crew Completes Heat Shield Inspection*
24 October 2007
View of shuttle robotic armImage Above: Space shuttle Discovery's
robotic arm with the attached boom extension is moved into position
shortly after completion of the heat shield inspection. Image credit: NASA
TO VIEW IMAGE GO
TO:http://www.nasa.gov/mission_pages/shuttle/main/index.html
The STS-120 crew members completed the day's scheduled inspections of
Space Shuttle Discovery’s heat shield before noon EDT. They used
Discovery’s robotic arm and an attached boom extension to check the
spacecraft’s underside, nose cap and leading edges of the wings as well
as hard to reach shuttle surfaces.
The inspections are performed to check if any damage occurred to the
heat shield during the climb to orbit that began when Discovery lifted
off Tuesday from Kennedy Space Center, Fla. Over the next few days,
engineers and flight controllers will analyze the data collected by the
STS-120 crew.
+ Animation of heat shield inspections
<javascript:watchNASAOnDemandTV('http://mfile.akamai.com/18566/wmv/etouchsyst2.download.akamai.com/18355/wm.nasa-global/sts-120/S04_TPS_Scans.asx')>
Throughout the day, the crew has been preparing for Thursday’s arrival
at the International Space Station. The day's activities include the
extension of the shuttle’s docking ring and the check out of tools they
will use to rendezvous and link up with the station. Docking is
scheduled to occur at 8:33 a.m. Thursday.
Earlier today, the STS-120 crew checked out spacesuits to be used during
the mission’s five scheduled spacewalks at the space station. One of the
major objectives of the spacewalks is the temporary installation of the
station’s newest component, the Node 2 module, also known as Harmony. In
addition, the crew will relocate the station’s P6 truss and solar arrays.
STS-120 is also delivering a new crew member to the station.
*Mission Information*
+ STS-120 Mission Overview
<http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts120/index.html>
+ Harmony Node 2
<http://www.nasa.gov/mission_pages/station/behindscenes/harmony_payload.html>
+ Space Shuttle Discovery
<http://www.nasa.gov/centers/kennedy/shuttleoperations/orbiters/discovery-info.html>
More information about the SAREX
mailing list